CHUM case study

Case History 2: Massive pile

This pile is one of the piles supporting a main bridge in China.

Bored and cast in place. Diameter 3m (10ft). length: 110m (360ft).  Just 4 metal access tubes installed.

No anomalies found.





Logged results